Electronic clean workshop decoration ventilation project construction scheme sharing

Industrial modular Clean Room time:2023/05/22 17:09:26 click:119

The ventilation construction scheme of electronic clean workshop engineering construction is formulated to ensure the air quality in the workshop, control the temperature, humidity, pressure and other parameters in the workshop, and meet the requirements of the production process. The scheme includes the design, construction, commissioning and acceptance of the ventilation system, with the specific Xiaobian together to understand it!

Electronic clean workshop decoration ventilation project construction scheme sharing

First, design requirements


1. The design of ventilation system shall meet the following requirements:


(1) The air quality in the workshop meets the relevant standards.


(2) The temperature, humidity, pressure and other parameters in the workshop meet the requirements of the production process.


(3) The ventilation system should have reliability, stability and safety.


(4) The ventilation system should be energy-saving and reduce energy consumption.


2. The design of ventilation system should consider the following factors:


(1) The air flow inside the workshop.


(2) Heat load and wet load inside the workshop.


(3) Pressure balance in the workshop.


(4) Noise control of ventilation system.


(5) Maintenance and cleaning of ventilation system.



Two, construction scheme


1. The construction of the ventilation system shall be carried out in accordance with the design scheme, and the following matters shall be paid attention to in the construction process:


(1) The construction site should be kept clean to prevent dust and debris from entering the ventilation system.


(2) Pipes, fans and other equipment of the ventilation system shall be installed according to the design requirements.


(3) The pipe connection of the ventilation system should be firm and sealed well.


(4) Electrical equipment of ventilation system shall be installed and connected in accordance with relevant standards.


(5) The commissioning of the ventilation system shall be carried out in accordance with the design requirements to ensure the normal operation of the system.


2. Acceptance of ventilation system shall be carried out in accordance with relevant standards, including the following:


(1) Parameters such as air flow, pressure and noise of the ventilation system meet the design requirements.


(2) Installation of pipes, fans and other equipment of ventilation system shall meet relevant standards and requirements.


(3) The installation and wiring of the electrical equipment of the ventilation system shall meet the relevant standards and requirements.


(4) The operation of the ventilation system is stable without abnormal noise and vibration.


Three, safety measures


1. The construction and commissioning of the ventilation system shall be carried out in accordance with the relevant safety regulations to ensure the personal safety of the staff.


2. The electrical equipment of the ventilation system should meet the relevant safety standards to ensure electrical safety.


3. The ventilation system should be maintained and cleaned regularly during operation to ensure the safe operation of the system.


The ventilation construction scheme of electronic clean workshop engineering construction is an important measure to ensure the air quality in the workshop, control the temperature, humidity, pressure and other parameters in the workshop, and meet the production process requirements. The design, construction, commissioning and acceptance of the ventilation system shall be carried out in accordance with relevant standards and regulations to ensure the reliability, stability and safety of the system. At the same time, the maintenance and cleaning of the ventilation system is also an important link to ensure the safe operation of the system.