Electronic, optical, precision instrument production and other industries are inseparable from clean workshop. Not only should we be careful and careful in production operations, but also in the construction of the workshop should be carried out in strict accordance with the industry norms. Then, what are the construction steps of electronic clean workshop? Now let's introduce it to you。

What are the construction steps of electronic clean workshop

1. Build the main structure

The structural material of electronic clean workshop should be sandwich color steel plate. If there is a civil wall, choose 5 cm, if there is no civil wall, choose 10 cm.

2. Install ventilation ducts

Ventilation duct should be selected according to the size of the workshop, materials should be selected to cross zinc plate production, in the cutting to achieve tight seam, to ensure that the material has no holes, durable.

3. Ground construction