News

How to install an air showe

Industrial modular Clean Room time:2022/11/30 16:09:07 click:159

There is no base and there is a base of air shower equipment, to have a base as an example, the equipment is composed of a bottom plate, air shower box (high efficiency filter, fan, nozzle), door, distribution box, etc.

How to install an air showe

1. The installation position shall provide suitable installation space, the ground shall meet the standard level, and the ground level tolerance shall not exceed 3mm.

Two, the bottom plate is generally made of stainless steel, friction-resistant and easy to clean. First of all, the air shower site device is installed in the air shower room;

Three, both sides of the air shower box is fixed on both sides of the chassis, with screws for fixing; After the top box is installed on both sides, the verticality and balance are measured to ensure that the two are connected correctly. The body uses ordinary color steel plate, the overall feeling is better, and the material of the clean room is consistent; Made of high quality cold rolled steel plate, modern and beautiful.

Four, the next is to install the door, the two doors before and after the air shower room for electronic interlock, using automatic control operation, induction automatic shower in the process of use, when the double door lock, the installation will be fixed on the hinges on the side of the air shower box can be, the hinges are reinforced with three stainless steel hinges, installed to ensure that the door box is completely seamless, There can be no gap between the clean room wall panel, and the place where there is a gap should be sealed.

Five, after the installation of the equipment, the installation and commissioning of the power supply, the air shower is three phase five wire system, three live wire, one ground wire, one zero line.