News

Purification engineering cost control three key links

Industrial modular Clean Room time:2022/11/07 16:33:53 click:162


First, strengthen the control of purification engineering design from the source:

1. The purification workshop planning should first strengthen the external supervision and review of the quality of the engineering drawings of the design unit. Review and supervise the design quality as the construction quality supervision station. This is directly related to the cost price of purification engineering companies.

Purification engineering cost control three key links


2. Formulate and design reward and punishment system. If the design drawing is confirmed as excellent design by the review center, the design unit shall be given special honor and the designer shall be rewarded.

3, formulate the "limit design" standard. Limit design is an effective control method in the process of engineering construction and one of the effective measures to control the scale of investment. Therefore, it is an important task in design management to organize relevant departments as soon as possible to formulate appropriate limit design standards according to different types, sizes and cleanliness requirements of purification workshops, and to serve as the "comparison table" of design departments.

4, with professional technology and reasonable equipment and materials, to optimize the technical indicators of the purification project, improve the overall efficiency of the purification project.

Two, focus on strengthening the control of purification engineering construction:

Before the project starts, project management is an effective way to improve labor productivity and economic benefits. And strengthen the cost price management of purification engineering company, reduce the price of purification workshop, is the top priority of project management, it is the same as the quality of purification engineering, is the lifeline of the enterprise. Applying standard cost to project cost management is a very effective method.

Three, the key to strengthen the control of purification workshop audit:

Purification workshop audit must be carried out on the whole process of the whole project construction production activities of audit, the audit should not only attach importance to the audited post audit and audit completion of the project, and matter more to pay attention to advance the audit, can make the purification workshop project construction plan establishment more hasten is reasonable, and can help the project management team in advance "check", effectively prevent or avoid the perception of mistakes.