What are the clean room transformation manufacturers? Clean room transformation manufacturer recommendation

Industrial modular Clean Room time:2022/03/21 09:38:01 click:302

What are the clean room transformation manufacturers? Nowadays, more and more enterprises have new demands for the construction and transformation of clean rooms. For relatively small production operations, how to transform and upgrade the existing space within a limited budget to meet the requirements of the process? So, today, Fujian clean room manufacturers homeopathic for the state xiaobian to tell you about clean room transformation matters needing attention.

What are the clean room transformation manufacturers? Clean room transformation manufacturer recommendation

In the current economic climate, the demand for small scale clean laboratories has shown significant growth momentum, as research and analysis investment in nanotechnology has increased significantly in various industries. A large number of such small-scale clean laboratories are needed in manufacturing, corporate R&D centers and research institutes in academic institutions. Whether it is composite materials for automotive and packaging materials, coatings, optical, biological and chemical detection systems, antimicrobial agents, or applications such as cancer treatment, drug delivery, imaging, diagnostics and monitoring, they require a multitude of new cleanrooms that have not been encountered before.

In many cases, these clean laboratories are retrofitted from existing space. Recently, my research institute and I are considering leasing the facility for use as a new type of controlled laboratory. The problem is further complicated by plans to convert rented factories that were not intended to be used as laboratories into clean laboratories, let alone clean rooms. As for research institutes, there are many similar problems in the renovation and upgrading of existing factories or the renewal of leased factories, and this paper will discuss some of them.

The idea of a clean room is to buy a pre-built, standardized box, install it in an existing factory, power up the lighting system and fans, and the factory is ready to go. However, these things only meet the minimum requirements of the clean room, this view is not suitable for the vast majority of clean room factories.

In the evaluation of a potential laboratory space, the first consideration is how to make the existing building according to the corresponding procedures to achieve the expected function, so that it meets the requirements of the laboratory. In short, the first step is to define the procedures that the laboratory needs to follow.

Preparation before construction:

While investigating the existing conditions, we should also investigate whether the market conditions are in line with the existing factory conditions, and grasp whether the existing conditions are in line with the requirements of the project schedule and performance. When selecting materials, the main consideration is availability to meet schedule requirements.

The entry and exit of materials, equipment and workers must be arranged in the pre-construction planning to ensure that the supplier's personnel can enter the construction area in a timely manner and will not waste time on the construction site due to access problems. The ideal solution to the access problem would probably be to install a temporary passageway and dressing room. Separating the construction entrances may seem like a luxury during the planning process, but the cost is more than offset by the role it plays in the construction process.

There is a distinction between clean and unclean in the shipping and storage of materials and components, so it must be integrated into the overall planning of retrofit plans and schedules. Proper material handling can greatly reduce labor costs and pollution. Constantly moving and transferring materials, there is a risk of material damage, and ultimately affect the progress of the renovation project. Good planning coupled with effective construction management ensures on-time material delivery and simplifies the staging of materials during installation. To do this, we need to reduce the space needed for material delivery and improve its flexibility.

Because the construction area must be separated from the surrounding space throughout construction, planning is required at the design stage. Issues to be considered include Spaces above ceilings, within ductwork, static pressure Spaces, return air clamps, liquid delivery lines and Spaces under floors to minimize and contain pollution from demolition and/or alteration work.

What are the clean room transformation manufacturers? The above is fujian clean room manufacturer homeopathy small series for you to introduce the knowledge of some matters needing attention in the transformation of clean room, I believe you should have a more professional understanding and understanding of the transformation of clean room after reading.