News

Purification workshop system engineering construction includes what items

Industrial modular Clean Room time:2022/01/05 16:07:23 click:30

New purification workshop of friends might be in purification engineering system don't understand, don't know what are the main purification engineering system, system composition, here small make up for everybody simple introduction clean engineering (purification engineering) system under the main part of this article is introduced, the understanding of friends of purification engineering help.

Purification workshop system engineering construction includes what items


The main components of workshop purification engineering have six parts, respectively: ground system, air duct system, automatic control system, electrical system, water supply and drainage system, air filtration system six parts.

Ground system: epoxy resin is generally used to clean the ground. Enclosure structure system: saying simply is top, wall, ground 3 parts, namely the 6 sides that compose 3 dimensional airtight space. To fine say to include window window, adornment arc to wait;

Air duct system: including supply air, return air, fresh air, exhaust pipe, terminal and control device, etc.; Air conditioning system: including cold (hot) water unit (including water pump, cooling tower, etc.) (or air cooled pipeline machine level, etc.), pipelines, combined purification air conditioning box (including mixed flow section, initial effect section, heating section, refrigeration section, dehumidification section, pressure section, medium effect section, static pressure section, etc.);

Purification workshop system engineering construction includes what items?

Automatic control system: including temperature control, temperature control, air volume and pressure control, opening sequence and time control, etc.

Electrical system: lighting, power, weak current three parts, including purification lamps, sockets, electrical cabinet, lines, monitoring, telephone and other strong and weak electric system;

Water supply and drainage system: water supply, drainage pipes, facilities and control devices, etc.

Air filtration system: secondary filter and other purification equipment: such as ozone, ultraviolet lamp, air shower (including cargo shower), transfer window, ultra-clean table, interlock and other purification auxiliary equipment.

Purification workshop project can be divided into air purification and water purification, air purification is within a certain space, the air particles, bacteria and other harmful air pollutants, and the indoor temperature, cleanliness, pressure, air velocity and air distribution, noise, vibration, and lighting, static control within the scope of a certain demand of engineering disciplines. Purification engineering specially designed room, no matter how the external air conditions change, indoor have to maintain the original set requirements of cleanliness, temperature and humidity and pressure performance.